The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.
No. of Platform 1
Piping Inch Dia 25,631
Structural In MT 157
2011-2012
© Das Offshore Limited 2024. All rights reserved.
Design & Developed by White Horse Agency Pvt Ltd