- Project
Additional Pipeline Project (APP)
- Scope
The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.
No. of Platform 11
Piping Inch Dia 13,703
Structural In MT 210
- Year
2013 – 2014