The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.
No. of Platform 9
Piping Inch Dia 12,000
Structural In MT 350
2014 -2015