The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.
No. of Platform 8
Piping Inch Dia 8,834
Structural in MT 420
2014 -2015
© Das Offshore Limited 2024. All rights reserved.
Design & Developed by White Horse Agency Pvt Ltd