https://www.dasoffshore.com/
Project

Pipeline Replacement Project - 3

Scope

The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.

No. of Platform       59
Piping Inch Dia       24,710
Structural In MT    1,081


Year

2012-2014

© Das Group 2018. All rights reserved.

Design & Developed by U-Wah