Construction of Skywalk at Sion from Ramdev-Vrindavan Hotel to Eastern Express Highway (Part-II)
Total Project Cost : 5.41 Cr
M 40 Concrete-530.44 Cum.
Structural Steel (Fabrication & Erection-281.75 MT).
SS Railing-858.56 M.
Polycarbonate:1642.46 Sqm.
Anti-Skid Tiles:1116.50 Sqm.
Aluminum composite panel:2301.43 Sqm
2011
© Das Offshore Limited 2024. All rights reserved.
Design & Developed by White Horse Agency Pvt Ltd