https://www.dasoffshore.com/
Project

Sion Skywalk Construction, Mumbai

Scope

Construction of Skywalk at Sion from Ramdev-Vrindavan Hotel to Eastern Express Highway (Part-II)

Total Project Cost : 5.41 Cr

M 40 Concrete-530.44 Cum. 
Structural Steel (Fabrication & Erection-281.75 MT).        
SS Railing-858.56 M. 
Polycarbonate:1642.46 Sqm.   
Anti-Skid Tiles:1116.50 Sqm. 
Aluminum composite panel:2301.43 Sqm


Year

2011

© Das Offshore Limited 2024. All rights reserved.

Design & Developed by White Horse Agency Pvt Ltd