https://www.dasoffshore.com/
Project

Water Supply Scheme, Kamothe, Navi Mumbai

Scope

Providing & Laying Water Supply Lines in sectors 34, 35 & 36 in Phase-II area at Kamothe, Navi Mumabi.

Length of DI Pipe Line Laid= 4120.00 Rmt.
(100 mm = 1836.00 Rmt. 150 mm = 549 Rmt. 200 mm = 540.00 Rmt. 250 mm = 122 Rmt. 300 mm = 188 Rmt. 350 mm = 639 Rmt. 400 mm = 164 Rmt. 500 mm = 82 Rmt)


Year

-

© Das Group 2018. All rights reserved.

Design & Developed by U-Wah