Laying of Sewer Line, Dronagiri, Navi Mumbai

Scope

Providing & Laying Sewer Line in Sector 47&48 under 12.5% Scheme ar Dronagiri, Navi Mumbai

Total Project Cost : Rs. 3.42 Cr

  • Excavation in Soil – 10131.29 Cum
  • Excavation in Slush – 9310.47 Cum
  • Stone Piling (300mm-500mm) – 15294.42 Rmt.
  • M-20 Grade Concrete – 436.47 Cum
  • RCC NP3 Class Pipes (250mm-600mm) – 4120.89 Rmt.

Year

2011